Description
For selected cost type(s) (e.g. transport, virgin material costs, waste treatment costs), direct impacts on costs should be estimated.
Methodology
Quantification of cost savings for the selected cost type using a practical method. The estimate should be accompanied by a qualitative description of the method, which cost items are included and which are excluded, with a justification of the choice.
The information above is specific to Bodø's evaluation plan. For general information on this indicator, please refer to
its entry in the list of indicators. What follows below is what has been filled out by the city.
It is interesting to measure if we can accomplish financial savings by treating masses and materials in a circular way. We want to measure
* Reduced transport costs as a result of treatment of resources on site, instead of transporting them to a waste management facility
* Cost savings by treating masses and reusing them on site instead of purchasing and transporting virgin materials
* Cost savings by selective demolition - reuse components from demolished buildings, where the alternative may be to purchase or design new components